We've been working a lot at the house. I wish I could say we have a room done, but I know that would be super naive of me. This project has only just begun, and we are trying to seal everything up before winter comes.
Disclaimer: These pictures are all out of date now, but I will catch you all up in my next post.
![]() |
| Trevor took out this set of steps, and then checked out the plumbing underneath the room. Above is a bathroom. |
![]() |
| This is the plumbing he found under the stairs in the crawl space. That's a large crack running through the pipe and he stuck his screw driver in a hole to show the size of the problem. |
![]() |
| This is another problem we found in the outside walls. This is approximately 1" insulation. We had not planned on taking off the drywall. Looks like we will be now. |
![]() |
| Last week's progress. View from the living room looking into a bedroom on the left, and a bathroom on the right. |
![]() |
| Gigantic spider on the garage |
![]() |
| Inside the bedroom looking into where the bathroom will be on the right, and a small closet on the left. Window to come out this week. |
![]() |
| There used to be a door here going into that bedroom which was totally ridiculous. The door is gone now. |







That spider tho....
ReplyDelete